Stössingbach Brücke
In April 2019 our company started with the work for a replacement of the Stössingbach bridge - railway bridge over the Michlbach in Böheimkirchen. We manufactured steel beams included their railing with a range of 7,46 meters, which now replace the old steel beams from 1947. For the lifting part the railway was closed single-tracked over three weeks, the bridge parts were lifted by a crawler cran.
Rubrik:
bridge building
Leistungsumfang:
manufacturing and delivering of steel beams with a range from 7,46m
incl. railing
Lifting with a crawler crane
Kunde:
Porr Bau GmbH
Bauherr:
ARGE ÖBB Stössingbachbrücke
Ausführungszeit:
april till november 2019