Felixdorf Bridge
The ÖBB bridge Felixdorf - Blumau is a steel structure with orthotopic sheet .The bridge has the dimensions of a total length of 30.2 m and a width of 7.2 m.
The total weight is 150 tons. The transport was carried out in 2 parts. The bridge was divided longitudinally, resulting in the dimensions of 3.6 x 2.8 x led to 30.2 m and a weight of 75 tons per part. This was the worst in the company's transportation history.
The single stroke of the two bridge sections was performed with 2 pieces of 160-ton auto crane. The assembly time was 8 days, the weld was carried out with a flush system in a separate assembly tent.